Meet the Team Ruben Rivera President Rose Buompensiero Director of Ops & Bookkeeping Reyna Rios Director of Customer Service & Sales Joe Teegarden Head of Engineering Eric Parks Executive Administrative Assistant Edgard Elizarraras Executive Director Scott Warren of Wellman and Warren LLP In Wenatchee Washington Our 19,500 sq. ft. Data Center features:6 Megawatts of IT LoadWe have a total of 6 megawatts of IT load to the facility, powered by 100% renewable energy.100% Green PowerPowered by the Columbia river, our substantially lower energy costs give us the ability to pass this savings on to our customers. In London, Kentucky We are building 2 data center facilities in Kentucky, with London, KY currently underway.